2426 La France Retaining Wall Improvement
COMPLETED G+R PROJECT
Project Details
Location
Fullerton, CA
Project Size
None
Year Completed
2025
Project Type
Residential Project
Service Type
Structural and Civil
Client
Private
The project involves structural improvements to reduce the encroachment of an existing retaining wall currently located within the City of San Diego’s public right-of-way (ROW). The work includes the construction of a new CMU (Concrete Masonry Unit) retaining wall designed according to the city’s standard specifications and drawings for public works.
Project Description
This project involves the structural modification and reconstruction of a Concrete Masonry Unit (CMU) retaining wall system for a residential property. The primary objective is to reduce the encroachment of the existing retaining wall within the public Right-of-Way (ROW) to ensure compliance with City of San Diego standards. The scope includes the demolition of non-compliant sections and the installation of new structural elements designed to manage soil pressure and site topography effectively.
The engineering design utilizes City of San Diego Standard Drawings for masonry retaining walls, specifically incorporating Type C wall specifications. The structural plan features both level and sloping backfill configurations, with detailed reinforcement requirements including vertical and horizontal rebars, solid-grouted masonry units, and specialized footing designs to ensure long-term lateral stability.
Technical specifications for the project adhere to the “Greenbook” and “Whitebook” 2018 editions for public works construction. Key structural considerations include precise excavation methods, such as 3-inch diameter boring for conduit to avoid tree root zones, and the implementation of robust erosion control programs to protect the site and surrounding infrastructure during the construction phase.
Let’s design your next high-
performance facility.
Speak directly with our senior project engineers about structural upgrades, automation integration, or end-to-end design–build delivery.
Share your layout, constraints, and schedule expectations—within 48 hours we’ll return a structured engineering perspective and clear next steps.
