2417 Elden Avenue Residential Development

COMPLETED G+R PROJECT

Project Details

Location

Costa Mesa, CA

Project Size

925 sq. ft.

Year Completed

2025

Project Type

Residential Project

Service Type

Plumbing

Client

Private

The project involves the construction of a new private sewer lateral system, including the installation of 4″ PVC SDR 35 pipe at a 2% slope, multiple 6″ sewer clean-outs, and the CCTV inspection and potential repair of an existing 6″ VCP sewer lateral to serve a multi-unit residential development.

Project Description

This project involves the development of a multi-unit residential complex located in Costa Mesa. The site plan features a sophisticated layout comprising seven distinct living units (Units A through G) and four additional units (Units K through N). Each unit is designed with dedicated bedroom spaces and modern amenities, supported by integrated garage facilities and a central driveway for efficient site circulation.

The engineering focus for this specific phase is the implementation of a robust sewer and sanitation system that conforms to the strict standards of the Costa Mesa Sanitary District. The infrastructure includes the installation of PVC SDR 35 sewer laterals maintained at a 2% slope to ensure optimal flow and functionality. The plan also details the strategic placement of clean-outs and wye connections to provide long-term maintenance access for the entire residential community.

To ensure structural integrity and compliance, the project scope includes comprehensive site preparation such as potholing to verify connection elevations and CCTV inspections of existing sewer laterals. The development adheres to the latest California Plumbing Code, featuring a combination of mechanical compression joints and precise grading to integrate the new construction seamlessly with existing municipal mainlines.

Let’s design your next high-
performance facility.

Speak directly with our senior project engineers about structural upgrades, automation integration, or end-to-end design–build delivery.

Share your layout, constraints, and schedule expectations—within 48 hours we’ll return a structured engineering perspective and clear next steps.

•

Direct access to senior project engineers.

•

Practical design options aligned with your budget.

•

Seamless collaboration with your operations team.

Scroll to Top